Instant Solar Permit - SolarAPP+

SolarApp Banner.png
Instant Solar Permit (ISP) Now Available through SolarAPP+

Contractors specializing in solar installations can now apply for the City's newly introduced Instant Solar Permit (ISP) through the assistance of SolarAPP+. This automated online platform is designed to streamline the process of obtaining permits for new residential rooftop solar and energy storage systems. By utilizing SolarAPP+, contractors can obtain an ISP promptly for solar and energy storage systems that comply with the relevant codes.

The ISP application is exclusively available to contractors registered with SolarAPP+ and covers both roof-mounted solar photovoltaic panel installations, with or without energy storage systems. Additionally, contractors can choose to include a main electrical service upgrade along with the ISP application. For a comprehensive list of eligible systems, please refer to the SolarAPP+ Eligibility Checklists. Only systems listed in these checklists qualify for the ISP when processed through SolarAPP+.

If you have any questions, feel free to contact the Building Division staff via email


Steps for Obtaining Instant Solar Permit

STEP 1: REGISTER AND LOG INTO SOLARAPP+

STEP 2: SUBMIT PROJECT IN SOLARAPP+

  • Submit your project through SolarAPP+.
  • Pay the processing fee charged by SolarAPP+. The fee is currently set at $25.
  • Download the approval documents. You will need to upload them into the City's online permitting portal, Citizen Access, when applying for your permit.

STEP 3: APPLY FOR PERMIT IN CITIZEN ACCESS

View the steps below: 

Apply for Permit

  • Log in to Citizen Access, the City's online permitting portal.
  • Apply for an "Instant Solar Permit (ISP)" in the portal. You will be asked to upload submittal documents, including those you downloaded from SolarAPP+. See below. 

Upload Required Submittal Documents

  • SolarAPP+ Approval Documents (all ISP applications)
  • SolarAPP+ Inspection Checklist (all ISP applications)
  • Equipment Specifications

Pay Permit Fees

  • Pay permit fees in Citizen Access.
    • One fee payment is required for the ISP. This is an inspection fee that covers two inspections for the same element (i.e., one failed inspection or cancellation after 2 p.m. the day preceding the inspection is covered by the permit fee). If additional inspections are required, re-inspection fees will be assessed and must be paid prior to the final inspection.

Next Steps

  • Once all of the required submittal documents are uploaded and the fees have been paid and the e-permit form is signed, the ISP will automatically issue. The signed ISP Permit/ Job Card will be generated and found in the "Attachment" section of the record in Citizen Access.

Revisions

STEP 4: SCHEDULE INSPECTION IN CITIZEN ACCESS

  • Log in to Citizen Access, the City's online permitting portal.
  • Select “My Records."
  • Select the record number.
  • Select “Schedule an Inspection” near the top of the page.
  • Complete the inspection request form.
SolarAPP+ Introduction Video

 

SolarAPP+ FAQs